Feasibility Report — $250

Send the address. Get a straight answer.

Within about a week you receive a written, parcel-specific report. If you move forward with design, the $250 is credited in full.

  • Zoning, overlays, and buildable envelope after setbacks
  • Maximum unit size, and whether a JADU can be added
  • SB 9 lot-split and AB 1033 separate-sale eligibility
  • Sewer, water, and electrical service capacity
  • The corrections your specific city is known to issue